Case Study
Henry Ford Brigitte Harris Cancer Pavilion
- Home
- »
- Henry Ford Brigitte Harris Cancer Pavilion
Project Overview
Project Location
Detroit, Michigan
Services Contracted
⦁ Optimize airflow and temperature control.
⦁ Ensure compliance with healthcare health and safety standards.
⦁ Enhance energy efficiency and reduce costs.
⦁ Evaluate HVAC design and performance.
⦁ Measure air and water flow rates, pressure differentials, and temperature
⦁ profiles.
⦁ Adjust air distribution for proper airflow in all areas, including treatment
⦁ rooms and waiting areas.
⦁ Balance hydronic systems for optimal heating and cooling.
⦁ Verify system performance against specifications.
⦁ Document findings and adjustments for future reference.
⦁ Coordinate with engineering teams, contractors, and facility managers
⦁ for seamless TAB integration.
⦁ Maintain regular communication to address issues promptly.